Manufactured Home Park Review Process
The Pitt County Development Ordinances, especially the Subdivision, Manufactured Home Park, and Multifamily Ordinances, require the submittal of plats or plans to the Planning Department for review. The ordinances provide minimum guidelines that must be addressed by the developer to ensure that the public health, safety, and welfare are adequately protected. The Department's review of the plats or plans ensures that each proposed development meets the specific standards outlined in the appropriate ordinance.
Types of Manufactured Home Parks:
- Minor Manufactured Home Parks - Four (4) spaces or less with no new street(s).
- Major Manufactured Home Parks - All others
Preliminary Plan Procedure For Minor Manufactured Home Parks
Preliminary Plat ApplicationStep 1) Submit 15 copies of Preliminary Plan to Pitt County Planning Department along with appropriate fee and preliminary plan application.
Step 2) Preliminary Plan is reviewed by Planning staff for compliance with the Manufactured Home Park Ordinance regulations.
Step 3) Preliminary Plan copies are transmitted to the applicable reviewing and regulatory agencies such as:
- Pitt County Environmental Health Division
- Pitt County Engineering Department
- Pitt County Emergency Services Department
- Utility Providers
NC Department of Transportation
Natural Resources Conservation Service
US Army Corps of Engineers
US Postal Service
Pitt County Board of Education
Step 4) Preliminary Plan is acted upon by Planning staff as approved, conditionally approved, or disapproved. Comments, requirements, and recommendations from Planning staff and review agencies are compiled into a list and forwarded to the developer and surveyor/engineer as part of a conditional approval.
Step 5) If conditionally approved, developer may proceed with As-Built Plan Procedure.
Preliminary Plan Procedure For Major Manufactured Home Parks
Preliminary Plat ApplicationStep 1) Submit 15 copies of Preliminary Plan to Pitt County Planning Department along with appropriate fee and preliminary plan application.
Step 2) Preliminary Plan is reviewed by Planning staff for compliance with the Manufactured Home Park Ordinance regulations.
Step 3) Preliminary Plan copies are transmitted to the applicable reviewing and regulatory agencies such as:
- Pitt County Environmental Health Division
- Pitt County Engineering Department
- Pitt County Emergency Services Department
- Utility Providers
NC Department of Transportation
Natural Resources Conservation Service
US Army Corps of Engineers
US Postal Service
Pitt County Board of Education
Step 4) Preliminary Plan is forwarded to the Technical Review Committee (TRC) for review and discussion of all requirements, conditions, and comments made by Planning staff and the review agencies.
Step 5) Preliminary Plan is forwarded to the Pitt County Planning Board, with recommendation from the TRC. Planning Board shall approve, conditionally approve, or disapprove the plat. Comments, requirements, and recommendations from Planning staff and review agencies are compiled into a list and forwarded to the developer and surveyor/engineer as part of a conditional approval.
Step 6) If conditionally approved, developer may proceed with Construction Plan Procedure.
Construction Plan Procedure For Major Manufactured Home Park
Construction Plat ApplicationStep 1) When installing a new street or other major improvement(s), submit 10 copies of Construction Plan to Pitt County Planning Department along with appropriate fee and Construction Plan application.
Step 2) Construction Plan is reviewed by Planning staff for compliance with the Manufactured Home Park Ordinance regulations.
Step 3) Construction Plan copies are transmitted to the applicable reviewing and regulatory agencies such as:
- Pitt County Environmental Health Division
- Pitt County Emergency Services Department
- Pitt County Building Inspections Department
- Water Provider
Natural Resources Conservation Service
NC Department of Transportation
Step 4) Construction Plan is forwarded to the Technical Review Committee (TRC) for review and discussion of all requirements, conditions, and comments made by Planning staff and the review agencies.
Step 5) Construction Plan is acted upon by Technical Review Committee (TRC) as approved, conditionally approved, or disapproved. Comments, requirements, and recommendations from Planning staff and review agencies are compiled into a list and forwarded to the developer and surveyor/engineer as part of a conditional approval.
Step 6) If conditionally approved, developer may proceed with Final Plat Procedure
As-Built Plan Procedure For Minor & Major Manufactured Home Parks
As-Built Plat ApplicationStep 1) Submit 15 copies of As-Built Plans to Pitt County Planning Department along with appropriate fee and application.
Step 2) As-Built Plan is reviewed by Planning staff for compliance with the Manufactured Home Park Ordinance regulations and compliance with preliminary plan and construction plan conditions and requirements.
Step 3) As-Built Plan copies are transmitted to the applicable reviewing and regulatory agencies such as:
- Pitt County Environmental Health Division
- Utility Providers
- Local Soil Erosion & Sedimentation Control Specialist : Jonas Hill
Step 4) As-Built Plan is approved or disapproved.


